Bridge Rehabilitation Projects -
Replacement of Guadalupe and Los Gatos Bridges
Project Lead:
Caltrain
Contractors:
To be determined by competitive bid
Project Limits:
Project will occur at two bridge sites:
- Guadalupe River Bridge
- Los Gatos Creek Bridge
Construction Cost:
$14 million (estimate)
Begin Construction:
July 2008
End Construction:
July 2009
Reason for Project:
This project is necessary to upgrade
bridges, which have
deteriorated with time and regular use.
Scope of Work:
Each bridge has specific requirements,
however, a general review of the scope
of work that will be done during this
project includes:
- Replacing existing bridges with pre-stressed/
pre-cast concrete decks
- Rehabilitating existing abutments
- Replacing center piers
- Constructing erosion protection under bridge embankments
|