Bridge Rehabilitation Projects -
Replacement of Quint and Jerrold Bridges
Project Lead:
Caltrain
Contractors:
To be determined by competitive bid
Project Limits:
Project will occur at two bridge sites:
- Quint Street
- Jerrold Street
Construction Cost:
$18 million (estimate)
Begin Construction:
January 2009
End Construction:
January 2010
Reason for Project:
This project is necessary to replace steel
span bridges, which have deteriorated with
time and regular use.
Scope of Work:
Each bridge has specific requirements, however, a general
review of the scope of work that will be done during this
project includes:
- Removing and replacing existing steel through-girders
- Installing drainage systems for the deck
- Reconstructing streets and pedestrian sidewalks
|