Bridge Rehabilitation Projects -
San Mateo Bridges and Grade Separation
Project Lead:
Caltrain
Contractors:
To be determined by competitive bid
Project Limits:
Project will occur at four different bridge sites at the
following mile posts:
- Tilton Avenue
- Monte Diablo Street
- Santa Inez Street
- Poplar Avenue
Construction Cost:
$40 million (estimate)
Begin Construction:
July 2008
End Construction:
July 2010
Reason for Project:
The project will replace these existing bridges that have
exceeded their useful life with new structures that are
consistent with existing seismic code and geometric
design requirements.
Scope of Work:
Each bridge has specific requirements, however, a
general review of the scope of work that will be done
during this project includes:
- Constructing retaining walls to contain raised embankments
- Modifying roads to accommodate the raised bridges
- Replacing the bridge structures
|