Caltrain Bridge Rehabilitation  Projects     
Caltrain

Bridge Rehabilitation Projects - San Mateo Bridges and Grade Separation

Project Lead:
Caltrain

Contractors:
To be determined by competitive bid

Project Limits:
Project will occur at four different bridge sites at the following mile posts:

  • Tilton Avenue
  • Monte Diablo Street
  • Santa Inez Street
  • Poplar Avenue

Construction Cost:
$40 million (estimate)

Begin Construction:
July 2008

End Construction:
July 2010

Reason for Project:
The project will replace these existing bridges that have exceeded their useful life with new structures that are consistent with existing seismic code and geometric design requirements.

Scope of Work:
Each bridge has specific requirements, however, a general review of the scope of work that will be done during this project includes:

  • Constructing retaining walls to contain raised embankments
  • Modifying roads to accommodate the raised bridges
  • Replacing the bridge structures