PCEP FEIR 2014

Peninsula Corridor Electrification Project (PCEP) Final Environmental Impact Report (FEIR), January 2015

Volume I-Revised Draft Environmental Impact Report (DEIR)
Cover Page and Title
Executive Summary
Table of Contents
Chapter 1: Introduction
Chapter 2: Project Description
Chapter 3: Settings, Impacts, and Mitigation Measures
3.1: Aesthetics
3.2: Air Quality
3.3: Biological Resources
3.4: Cultural Resources
3.5: Electromagnetic Fields and Electromagnetic Interference
3.6: Geology, Soils, and Seismicity
3.7: Greenhouse Gas Emissions and Climate Change
3.8: Hazards and Hazardous Materials
3.9: Hydrology and Water Quality
3.10: Land Use and Recreation
3.11: Noise and Vibration
3.12: Population and Housing
3.13: Public Services and Utilities
3.14: Transportation and Traffic
Chapter 4: Other CEQA-Required Analysis
Chapter 5: Alternatives
Chapter 6: Report Preparation
Chapter 7: References

Volume II-Comments on DEIR and Responses
Chapter 1: Introduction
Chapter 2: Comments
Chapter 3: Responses to Comments
Chapter 4: References

Volume III-Appendices
Appendix A: Scoping Summary Report
Appendix B: Air Quality and Greenhouse Gas Analysis Technical Data
Appendix C: Noise and Vibration Technical Report
Appendix D: Transportation Analysis
Part 1
Part 2
Part 3
Part 4
Part 5-Attachments A-E
Part 6-Attachment F
Part 7-Attachaments G-J
Appendix E: Cultural Resources Programmatic Agreement
Appendix F: Tree Inventory and Canopy Assessment
Appendix G: Biological Resources Information
Appendix H: Land Use Information
Appendix I: Ridership Technical Memorandum
Appendix J: OCS/ESZ Tree Impact Maps
Introduction
Grid A
Grid B
Grid C
Grid D
Grid E
Grid F
Grid G
Grid H
Grid I
Grid J
Appendix K: Alternative Key Assumptions

Addenda
Addendum 1 PS7
Addendum 2 Pole Relocations
Addendum 4 PS2
Re-Evaluation of Proposed Project Changes

To Download Full Document
Volume I- Revised DEIR(54MB)
Volume II- Comments on DEIR and Responses(38MB)
Volume III- Appendices(141MB)

Mitigation Monitoring and Reporting Program (MMRP)
MMRP(512KB)

Notice of Availability (NOA) of PCEP Final Environmental Impact Report and Public Meeting
English
Español,
關中文資料,
Thông tin bằng tiếng Viet.

The formal comment period for the Draft EIR ended April 29, 2014 after a 60 day public review period. To view the DEIR document, please click here.

08/10/2018 - bct