Peninsula Corridor Electrification Project (PCEP) Final Environmental Impact Report (FEIR), January 2015
Volume I-Revised Draft Environmental Impact Report (DEIR)
Cover Page and Title
Executive Summary
Table of Contents
Chapter 1: Introduction
Chapter 2: Project Description
Chapter 3: Settings, Impacts, and Mitigation Measures
3.1: Aesthetics
3.2: Air Quality
3.3: Biological Resources
3.4: Cultural Resources
3.5: Electromagnetic Fields and Electromagnetic Interference
3.6: Geology, Soils, and Seismicity
3.7: Greenhouse Gas Emissions and Climate Change
3.8: Hazards and Hazardous Materials
3.9: Hydrology and Water Quality
3.10: Land Use and Recreation
3.11: Noise and Vibration
3.12: Population and Housing
3.13: Public Services and Utilities
3.14: Transportation and Traffic
Chapter 4: Other CEQA-Required Analysis
Chapter 5: Alternatives
Chapter 6: Report Preparation
Chapter 7: References
Volume II-Comments on DEIR and Responses
Chapter 1: Introduction
Chapter 2: Comments
Chapter 3: Responses to Comments
Chapter 4: References
Volume III-Appendices
Appendix A: Scoping Summary Report
Appendix B: Air Quality and Greenhouse Gas Analysis Technical Data
Appendix C: Noise and Vibration Technical Report
Appendix D: Transportation Analysis
Part 1
Part 2
Part 3
Part 4
Part 5-Attachments A-E
Part 6-Attachment F
Part 7-Attachaments G-J
Appendix E: Cultural Resources Programmatic Agreement
Appendix F: Tree Inventory and Canopy Assessment
Appendix G: Biological Resources Information
Appendix H: Land Use Information
Appendix I: Ridership Technical Memorandum
Appendix J: OCS/ESZ Tree Impact Maps
Introduction
Grid A
Grid B
Grid C
Grid D
Grid E
Grid F
Grid G
Grid H
Grid I
Grid J
Appendix K: Alternative Key Assumptions
Addenda
Addendum 1 PS7
Addendum 2 Pole Relocations
Addendum 4 PS2
Re-Evaluation of Proposed Project Changes
To Download Full Document
Volume I- Revised DEIR(54MB)
Volume II- Comments on DEIR and Responses(38MB)
Volume III- Appendices(141MB)
Mitigation Monitoring and Reporting Program (MMRP)
MMRP(512KB)
Notice of Availability (NOA) of PCEP Final Environmental Impact Report and Public Meeting
English
Español,
é—œä¸æ–‡è³‡æ–™,
Thông tin bằng tiếng Viet.
The formal comment period for the Draft EIR ended April 29, 2014 after a 60 day public review period. To view the DEIR document, please click here.
08/10/2018 - bct